Kids Library Home

Welcome to the Kids' Library!

Search for books, movies, music, magazines, and more.

     
Available items only
Record 37 of 37
Previous Record Next Record
E-Book/E-Doc
Author Hurt, Mark A., author.

Title Highway bridge maintenance planning and scheduling / Mark Hurt, Steven D. Schrock.

Imprint Amsterdam : Elsevier, 2016.

Copies

Location Call No. OPAC Message Status
 Axe Elsevier ScienceDirect Ebook  Electronic Book    ---  Available
Description 1 online resource
text txt rdacontent
computer c rdamedia
online resource cr rdacarrier
text file
Note Online resource; title from PDF title page (EBSCO, viewed March 18, 2016).
Bibliography Includes bibliographical references.
Summary Highway Bridge Maintenance Planning and Scheduling provides new tactics for highway departments around the world that are faced with the dilemma of providing improved operations on a shoestring budget. Even after the much needed infrastructure funding is received, the question of which project comes first must be answered. Written by a 20-year veteran with the Kansas Department Of Transportation Bridge Office in design and in maintenance, this book provides Senior Bridge Maintenance Engineers with practical advice on how to create an effective maintenance program that will allow them to not only plan, schedule, direct, and monitor highway bridge repair and rehabilitation projects, but also evaluate all completed work for technical acceptability, productivity, and unit-cost standards. Provides the tools and methods for building, maintaining, planning, and scheduling effective maintenance Presents experience-based suggestions for evaluating highway bridges to determine maintenance priorities Includes methods for evaluating all completed work for technical acceptability, productivity, and unit-cost standards.
Contents 1. Introduction -- 1.1. Bridges in the United States -- 1.2. Bridge Preservation Process -- 1.3. Bridge Preservation Practices Before 1970 -- 1.4. Development of the National Bridge Inspection Standards -- 1.5. Ongoing Changes in Practice -- 1.5.1. Collapse of the I-35W Bridge -- 1.5.2. Preventing the Next Failure -- 1.5.3. Cost of Failure -- 1.6. Managing the Bridge Preservation Process -- 1.7. Scope and Purpose of the Text -- References -- 2. Bridge Elements and Materials -- 2.1. Classification of Bridge Structures -- 2.2. Buried Structures -- 2.3. Elements of Span Bridge Structures -- 2.3.1. Substructure Elements -- 2.3.2. Superstructure Types and Elements -- 2.4. Bridge Mechanics -- 2.4.1. Axial Forces -- Tension -- 2.4.2. Axial Forces -- Compression -- 2.4.3. Forces From Transverse Loading -- Bending -- 2.4.4. Transverse Loadings -- Shear -- 2.4.5. Fracture and Fatigue -- 2.5. Bridge Materials -- 2.5.1. Concrete and Reinforced Concrete -- 2.5.2. Prestressed Concrete -- 2.5.3. Steel -- 2.5.4. Timber -- 2.5.5. Other Materials -- References -- 3. Bridge Inspection and Evaluation -- 3.1. Introduction -- 3.2. Bridge Inspection in the United States -- 3.2.1. Types of Inspection -- 3.2.2.Component Condition Ratings -- 3.2.3. Appraisal Ratings -- 3.2.4. Deficiency and Sufficiency -- 3.2.5. Critical Findings -- 3.2.6. Element-Level Inspection -- 3.3. Bridge Inspections in Canada, Western Europe and South Africa -- 3.3.1. Canada -- 3.3.2. United Kingdom -- 3.3.3. South Africa -- 3.3.4. France -- 3.3.5. Germany -- 3.3.6. Finland -- 3.3.7. Observations -- 3.4. Reliability-Based Bridge Inspection -- 3.4.1. Risk-Based Assessment -- 3.4.2. Implementation in Indiana -- 3.5. Inspection Techniques and Technologies -- 3.5.1. Visual Inspections and Sounding -- 3.5.2. Nondestructive Testing -- Concrete -- 3.5.3. Nondestructive Testing -- Steel -- 3.5.4. Sampling -- 3.5.5. Inspecting Fiber-Reinforced Polymer -- 3.5.6. Posttensioning Ducts -- 3.5.7. Structural Health Monitoring -- 3.5.8. Sonar and Underwater Inspection -- 3.6. Load Rating -- 3.6.1. General Approach -- 3.6.2. Analysis Methodologies -- 3.6.3. Truck Loadings -- 3.6.4. Load Rating by Testing -- 3.6.5. Fatigue Evaluation of Steel Bridges -- 3.6.6. Programming Maintenance Actions -- References -- 4. Preventative Maintenance -- 4.1. Introduction -- 4.2. Cost Effectiveness -- 4.3. Maintenance Inspections -- 4.4. Bridge Decks and Expansion Joints -- 4.4.1. Deck Drainage -- 4.4.2. Deck Patching -- 4.4.3. Deck and Crack Sealing -- 4.4.4. Deck and Expansion Joint Washing -- 4.4.5. Timber Deck Preservation -- 4.5. Bridge Superstructure and Substructure -- 4.5.1. Washing Superstructures -- 4.5.2. Sealing Bearing Seats -- 4.5.3. Bearing Device Maintenance -- 4.5.4. Painting -- 4.6. Bridge Substructure and Waterway -- 4.7. Approaches and Roadways -- 4.7.1. Driver Guidance -- 4.7.2. Approach Settlement -- 4.7.3. Relief Joints -- 4.8. Recommendations -- References -- 5. Substantial Maintenance and Rehabilitation -- 5.1. Introduction -- 5.2. Assessment and Scoping -- 5.2.1. Closing or Removing Bridges -- 5.2.2. Level of Repair -- 5.2.3. Design Codes and Specifications -- 5.3. Repair Methods -- 5.3.1. Concrete -- 5.3.2. Steel -- 5.4. Substantial Maintenance Actions -- 5.4.1. Decks and Railing -- 5.4.2. Expansion Joints -- 5.4.3. Bearing Devices -- 5.4.4. Steel Superstructure -- 5.4.5. Painting Steel Structures -- 5.4.6. Reinforced Concrete Superstructure -- 5.4.7. Prestressed Concrete Superstructure -- 5.4.8. Posttensioned Concrete Superstructure -- 5.4.9. Piers and Pier Bents -- 5.4.10. Abutments -- 5.4.11. Culverts -- 5.5. Rehabilitation Actions -- 5.5.1. Deck Replacement -- 5.5.2. Superstructure Replacement -- 5.5.3. Bridge Widening -- References -- 6. Bridge Life Cycle Costing -- 6.1. Project Scoping and Selection -- 6.1.1. Initial Selection -- 6.1.2. Adjusting Scope -- 6.2. Bridge Life Cycle Cost Analysis -- 6.2.1. Inflation -- 6.2.2. Discount Rate -- 6.2.3. Cash Flow Diagrams -- 6.2.4. Residual Value -- 6.3. Determining Costs -- 6.3.1. Agency Costs -- 6.3.2. User Costs -- 6.3.3. Vulnerability Costs -- 6.3.4. Economic Costs -- 6.4. Deterioration Rates -- 6.5. Applying Bridge Life Cycle Costing -- 6.5.1. BLCCA Programs -- 6.5.2. Typical Applications of BLCCA -- References -- 7. Bridge Management -- 7.1. Contemporary History of Bridge Management -- 7.1.1. Before the NBIS -- 7.1.2. Definition of Bridge Management -- 7.1.3. Level of Service -- 7.1.4. BMS Software -- 7.1.5. Asset Management -- 7.2. Project and Program Selection -- 7.2.1. Priority Ranking -- 7.2.2. Programming Maintenance Work -- 7.2.3. Priority Indexing -- 7.3. Experiences from the Kansas Department of Transportation -- 7.3.1.Commitment to Bridge Preservation -- 7.3.2. Coordination Between Bridge Inspection and Design -- References.
Subject Bridges -- Maintenance and repair.
Ponts -- Entretien et réparations.
TECHNOLOGY & ENGINEERING -- Civil -- General.
Bridges -- Maintenance and repair
Added Author Schrock, Steven D., author.
Other Form: Print version: Hurt, Mark A. Highway bridge maintenance planning and scheduling. Cambridge, MA : Elsevier, [2016] 9780128020692 (DLC) 18960986
ISBN 0128020849 (electronic bk.)
9780128020845 (electronic bk.)
9780128020692
0128020695
Standard No. AU@ 000059396750
CHNEW 001013458
DEBSZ 482469706
GBVCP 871530597
GBVCP 87939238X

 
    
Available items only