Description |
1 online resource (vii, 37 p.) : col. ill. |
Series |
NREL/TP ; 6A20-49846 |
|
NREL/TP ; 6 A 20-49846.
|
System Details |
Full text available via Internet in .pdf format. Adobe Acrobat Reader required. |
Note |
Title from title screen (viewed on September 12, 2011). |
|
"August 2011." |
Summary |
This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on a brownfield site at the Refuse Hideaway Landfill in Middleton, Wisconsin. The site currently has a PV system in place and was assessed for further PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.1333/kWh and incentives offered by the State of Wisconsin and by the serving utility, Madison Gas and Electric. According to the site production calculations, the most cost-effective system in terms of return on investment is the thin-film fixed-tilt technology. The report recommends financing options that could assist in the implementation of such a system. |
Funding |
DE-AC36-08GO28308 WFD4.1000 |
Subject |
Photovoltaic power generation -- Wisconsin -- Middleton -- Finance.
|
|
Solar power plants -- Location -- Wisconsin -- Middleton -- Planning.
|
|
Brownfields.
|
|
Reclamation of land.
|
Added Author |
Mosey, Gail.
|
|
National Renewable Energy Laboratory (U.S.)
|
|
United States. Environmental Protection Agency.
|
Added Title |
Siting renewable energy on potentially contaminated land and mine sites |
Gpo Item No. |
0430-P-03 (online) |
Sudoc No. |
E 9.16:NREL/TP-6 A 20-49846 |
|